000 01842nam a2200349Ia 4500
001 EBC3564061
003 MiAaPQ
005 20240121062930.0
006 m o d |
007 cr cn|||||||||
008 030801s2003 dcubd sb 000 0 eng d
020 _z0309088879
035 _a(MiAaPQ)EBC3564061
035 _a(Au-PeEL)EBL3564061
035 _a(CaPaEBR)ebr10068502
035 _a(CaONFJC)MIL20924
035 _a(OCoLC)54384442
040 _aMiAaPQ
_cMiAaPQ
_dMiAaPQ
050 4 _aTA845.B6
_bC655 2003
245 0 0 _aCompleting the "Big Dig"
_h[electronic resource] :
_bmanaging the final stages of Boston's Central Artery/Tunnel Project /
_cCommittee for Review of the Project Management Practices Employed on the Boston Central Artery/Tunnel ("Big Dig") Project; Board on Infrastructure and the Constructed Environment; Division on Engineering and Physical Sciences, National Acadeny of Engineering; National Research Council; Transportation Research Board of the National Academies.
260 _aWashington, D.C. :
_bNational Academies Press,
_cc2003.
300 _ax, 49 p. :
_bcharts, map.
500 _a"This study was supported by contract no. 02-1218 between the National Academy of Sciences and the Massachusetts Turnpike Authority"--p. ii.
504 _aIncludes bibliographical references.
533 _aElectronic reproduction. Ann Arbor, MI : ProQuest, 2016. Available via World Wide Web. Access may be limited to ProQuest affiliated libraries.
610 2 0 _aCentral Artery/Third Harbor Tunnel Project (Mass.)
650 0 _aTunnels
_zMassachusetts
_zBoston
_xDesign and construction.
650 0 _aTunneling
_zMassachusetts
_zBoston.
655 4 _aElectronic books.
710 2 _aProQuest (Firm)
856 4 0 _uhttps://ebookcentral.proquest.com/lib/bacm-ebooks/detail.action?docID=3564061
_zClick to View
999 _c233490
_d233490